Improved Scheduler for Long Term Evolution (Lte) Downlink Transmission
Improved Scheduler for Long Term Evolution (Lte) Downlink Transmission
Abstract of Improved Scheduler for Long Term Evolution (Lte) Downlink Transmission
Improved Scheduler for Long Term Evolution (Lte) Downlink Transmission
Design and Construction of a 1kva Mobile Solar Generator Chapter One of Design and Construction of a 1kva Mobile Solar Generator INTRODUCTION Preamble A power inverter, or inverter, is an electronic device or circuitry that changes direct current (DC) to alternating current (AC). (The Authoritative, 2000). The input voltage, output voltage and frequency, and…
Transformer Rewinding Machine With Digital Abstract of Transformer Rewinding Machine With Digital This project is on design and construction of transformer rewinding machine with digital counter. A coil winding machine is a machine for winding coil onto a spool, bobbin and many more. This coil winding machine is one of types of winding machine…
Design and Construction of a Car Tracker System Abstract of Design and Construction of a Car Tracker System The purpose of this project is to design and construct a car tracker system with code using GSM. A good car attracts everyone including thieves. When it comes to the safety of cars, car owners should be very…
Design and Construction of Single Phase Automatic Change Over Switch From Generator to Power Holding Company of Nigeria (P.h.c.n) Abstract of Design and Construction of Single Phase Automatic Change Over Switch From Generator to Power Holding Company of Nigeria (P.h.c.n) The most industrial and commercial process are depedent on electrical power in the event…
Bacteriological Assessment of Some Commercially Prepared Yoghurt Abstract of Bacteriological Assessment of Some Commercially Prepared Yoghurt Bacteriological assessment of commercially prepared yoghurt was carried out. The pour plate technique was employed using Nutrient Agar, de Man Rogosa Sharpé (MRS) and CLED (Cystein, Lactose, and Electrolyte Deficient Agar) for bacteria. Gram staining and biochemical tests…
Construction of an Automatic Change Over Switch (3.7kva) Chapter One of Construction of an Automatic Change Over Switch (3.7kva) INTRODUCTION BACKGROUND The Change Over Switch I a device used to switch off a power supply and subsequently switch on another power supply. Basically it is aimed at switching on a more convenient power supply…